remontage régulateur vitesse

NCG workshop: steps of overhaul process

Specialized in speed control of rotating thermal machines, we lead you in our workshop to discover the governor’s overhaul process.

Atelier NCG

When does the governor’s overhaul must be done?

Our technicians assist our customers in the preventive and curative maintenance of their equipment. The mechanical overhaul of a governor must be done every 3 years, or after 15 000 hours of use, to ensure its efficiency.

 

We carry out the complete overhaul of the equipment, in accordance with the manufacturer’s specifications and ISO requirements.
Since 2015, NCG has been ISO 9001 and ISO 14001 certified, enabling us to guarantee quality service with consideration for the preservation of the environment.

 

What are the steps of overhaul process?

  1. At the reception of the equipment, we check its condition and record it in our tracking system. We carry out a test bench and analyze any deviation with the manufacturer’s test sheet and the curves.
    We have manufacturer test benches allowing us to carry out an in-depth diagnosis of the equipment and to guarantee optimal testing.

Premier passage au banc du régulateur

  1. Then the governor is completely disassembled and cleaned, stripped, and degreased. For this step, in accordance with our ISO 14001 certification, we use products that are not harmful to health and environment in our machines.

Démontage du régulateur.    nettoyage du régulateur

  1. Our technical team checks each part and defines those that must be replaced in the report.
    Note: We take pictures of the equipment upon receipt and of the used parts, and insert them in the report, with the curves on arrival.

révision : expertise du régulateur à l'atelier         expertise du régulateur à réception

  1. After receiving the customer’s agreement, we prepare the spare parts and proceed to the complete reassembly of the equipment.
    We have a large stock consisting only of manufacturer-guaranteed parts.

remontage régulateur vitesse

  1. A final test bench and a new manufacturer’s test sheet are carried out to validate the correct functioning of the governor. Then we send the final expert report (new curves, recommendations, etc.).

Passage au banc final      Banc constructeur

  1. The governor is completely repainted and shipped back. It is reconditioned with a 24-month parts and labor warranty, all over the world!

Related articles

News

Africa Industrialization Day

Celebrating Africa’s industrialization with Normandy Control Group Wednesday November 20 was Africa Industrialization Day – a unique opportunity to highlight the importance of industrialization for sustainable development and prosperity on the continent. At Normandy Control Group, we are proud to

Lire la suite »
Practical Info

Woodward 505

The Woodward 505 Controller: A High-Performance Solution for Turbomachinery Turbomachinery plays a crucial role in many industrial sectors, and its performance often depends on a reliable and precise control system. The Woodward 505 is an essential solution in this field,

Lire la suite »
logo salon petrochymia 2024
News

Petrochymia 2024

Normandy Control Group at Petrochymia 2024 NCG is pleased to announce its participation in Petrochymia 2024, a leading event for professionals in the petrochemical, gas, energy and process industries. The show will be held on November 27 and 28, 2024

Lire la suite »