Latest news from NCG

NCG - Challenge RSE
News

CSR Challenge

CSR Challenge closes: Normandy Control Group finishes 2nd! The CSR Challenge, organized by the UIMM du Havre, concluded after two intense weeks focused on

Read more
News

Woodward power limiting

A technical solution to optimize turbine management Adapting control systems is essential to guarantee the performance and safety of industrial installations. Recently, our teams

Read more
formation régulation industrielle
Training

Industrial control training

1. Optimizing performance and reducing downtime Training in industrial control (Woodward controllers, for example) enables your technicians to better understand and master control systems.

Read more
Formation woodward
Training

Woodward training

Train your teams with Normandy Control Group At Normandy Control Group, we’re committed to sharing our know-how to help our customers and partners get

Read more
Formation pratique : Banc d'essai
Training

Resumption of our training

Despite the current situation, our training program has resumed with barrier gestures and physical distancing. Our training program We offer to our customers in

Read more
Woodward EGB
Non classé

EGB Woodward

What is an EGB Woodward governor ? The EGB Woodward is an electro-hydraulic actuator-regulator, designed to provide precise speed and power control on industrial

Read more
Practical Info

Proact woodward

What is ProAct Woodward? The Woodward ProAct is a high-performance electric actuator designed by Woodward, world leader in control systems for engines and turbines.

Read more
centrale algérie
Practical Info

Woodward governor Algeria

Algeria’s energy challenges Algeria’s energy mix is dominated by natural gas, with the vast majority of its electricity production provided by thermal power plants.

Read more
Project

turbo-pump modernization

Turbo-pump modernization Creusot turbo feed pumps (TPA) to supply water to the main turbine boiler, Woodward PG-PL type mechanical speed control with air control.

Read more
Project

steam turbine modernization

STEAM TURBINE MODERNIZATION Flex 500 CUSTOMER PROBLEMS SOLUTIONS IMPLEMENTED BY NCG The NCG engineering office examined the OEM data. The old turbine control logic

Read more
Project

NCG realization

Control and protection cabinet for turbo-generator set Manufacturing and Configuring Control and Protection Panels for a Turbo Alternator Group At Normandy Control Group, our

Read more