450 Mwe combined-cycle turbine modernization – Meggitt

450 MWe combined-cycle turbine upgrade: Meggitt VM600 MK II

Customer problems

As part of the ten-year service on the GAS Turbine – Alternator – Steam Turbine shaft line, the customer opted to replace the entire vibration measurement chain (transducer, extension and conditioner) in order to secure operation for the next 10 years. NCG replaced, calibrated and tested the entire new vibration protection system.

Objectives :

  • Improve safety
  • Increase reliability
  • Increase availability
  • Deal with obsolescence
  • Increase maintainability
  • Better monitoring of operation

 

Solutions

In total :

– 18 complete measurement chains were replaced (transducers – conditioners)

– 2 Meggitt vibration racks replaced (MK1 generation replaced by MK2 generation)

– Validation of configuration and wiring by signal simulation tests.

Results:

Turbine safety and availability were increased, and the obsolescence problem was solved.

Related articles

News

NCG at the FENO 2025

From October 17 to 19, 2025, Normandy Control Group will participate in the FENO trade show in Rouen, a flagship event that brings together companies, institutions, and innovative players from the Normandy region every year. We will be pleased to

Lire la suite »
Practical Info

Woodward speed governors

Why is speed regulation essential in industry? In an industrial context where reliability, safety, and performance are major challenges, speed control and Woodward speed governors play a decisive role. Whether for diesel or gas engines, steam, hydraulic, or gas turbines,

Lire la suite »